Waterwatch Data Portal
CO_SWA110 Lake Victoria outlet @ Bellarine Hwy
25 August 2011
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Lake Victoria outlet @ Bellarine Hwy CO_SWA110 |
Date and Time | Thursday 25th August 2011 12:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 85 | 8.2 | 9.7 | 0.06 | 16 | 16.1 | 2 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 5 |
Flow estimate | Moderate |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | plastic |
ECTestr11 meter not working. System forcing me to enter a figure, so entered 0.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au