Waterwatch Data Portal
NC_BIR500 Birch Creek @ Mullers Lane, Smeaton
21 January 2011
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Birch Creek @ Mullers Lane, Smeaton NC_BIR500 |
Date and Time | Friday 21st January 2011 11:50am |
Approved | Approved |
Physical Chemical Tests
D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 179 | 0.01 | 18 | 18 |
Weather | |
---|---|
Last rainfall | 220 |
Flow estimate | Rapid |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
From 10-14 Jan I measured 220 ml of rain but higher in Birch's Creek catchment, they exceeded 250 ml in the Mollonghip, Dean areas. Hence again, we saw the creek in flood to equal the 4th Sept flood. Not as much debris this time but more erosion. Potatoe farmers in the upper areas on the choice red soils report loss's of an average 10% for the last three lots of heavy rain events - that's where the red discolourations come from. The difference and how much vegetation was lost even though most was willow, and the leaveson the trees now.... use the old gums as a reference.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au