Waterwatch Data Portal
CO_SWA110 Lake Victoria outlet @ Bellarine Hwy
12 November 2010
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Lake Victoria outlet @ Bellarine Hwy CO_SWA110 |
Date and Time | Friday 12th November 2010 14:30pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 81 | 6.9 | 75500 | 9.2 | 0.01 | 30 | 23 | 13 |
Weather | cloudy |
---|---|
Last rainfall | More than a week ago 13 |
Flow estimate | Slow |
Water Appearance | Clear |
Stream depth | 0.55 |
Stream width | 2 |
Hazards | |
Litter/Pollutants | packets |
Turbidity output in FAU. Flowing out to bay.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au