Overview

Catchment Goulburn River
Site Sunday Creek behind 2 John Crt Waterford Park GB_SUN004
Date and Time Friday 30th September 2011 16:30pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units Rain mm Water ° C Turb NTU
Sample 150 12.9 60
Weather cloudy
Last rainfall During the last week 64
Flow estimate Rapid
Water Appearance Muddy
Stream depth 1m - 2m
Stream width 2m - 5m
Hazards
Litter/Pollutants
We have had 64mm in the last 48hrs (28-30/9/11). The bridge area and the test site area were flooded. The drain is unable to be seen due to mud slide. Many dead sticks and logs washed down, large deposits of mud on the banks. The creek is very fast flowing and the water level is declining.

Diary photos

No diary entries recorded for this visit