Site visit details

Overview

Catchment Yarra River
Site small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698
Date and Time Tuesday 19th July 2011 10:45am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.15 9 530 7 0.15 15.1 12 150
Weather cloudy
Last rainfall During the last 24 hours
Flow estimate
Water Appearance
Stream depth 0 - 50cm
Stream width 1.0
Hazards
Litter/Pollutants
flowing steady, muddy cloudy water ammonium and phosphate samples filtered and warmed to 19 degrees C

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au