Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, Dundas Street Drain or Cave Clan Drain (upstream footbridge and Dundas St wetland) Thornbury/Ivanhoe ME_YDA534
Date and Time Saturday 15th October 2011 09:40am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.23 2.3 1840 7.5 20.24 19.5 16.5 8
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Ammonium has been diluted 3 times. (2.53 * 8 = 20.24)

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au