Site visit details

Overview

Catchment Yarra River
Site Diamond Creek, Railway Pde, Eltham ME_YDI810
Date and Time Saturday 22nd October 2011 10:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.03 7 390 0.03 15.7 11.2 40
Weather raining
Last rainfall Raining Now
Flow estimate Permanent
Water Appearance Muddy
Stream depth 1.4
Stream width 12
Hazards
Litter/Pollutants cans,plastic
pH meter unreliable; noting a new one was received on 3/11/11, thank you. Dissolved Oxygen of 7 mg/L at 66% saturation

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au