Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
27 August 2011
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 27th August 2011 10:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 7 | 330 | 0.02 | 13 | 11.5 | 35 |
Weather | sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | Slow |
Water Appearance | Muddy |
Stream depth | 1m - 2m |
Stream width | >5m |
Hazards | |
Litter/Pollutants | cans,plastic,other |
Our pH meter was defective, so no reading was recorded. There had not been so much rain, so the water level had gone down since last month.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au