Waterwatch Data Portal
ME_YDI847 Karingal Creek, crn Susan and Brougham St, Eltham
20 April 2011
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Karingal Creek, crn Susan and Brougham St, Eltham ME_YDI847 |
Date and Time | Wednesday 20th April 2011 09:35am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 7 | 1290 | 7.6 | 0.07 | 15.1 | 15.1 | 7 |
Weather | overcast |
---|---|
Last rainfall | During the last week 8 |
Flow estimate | Moderate |
Water Appearance | Clear,Oily |
Stream depth | 0.26 |
Stream width | 4 |
Hazards | |
Litter/Pollutants | cans,plastic,other |
1. Parts of the bank have been washed away, presumably by the floods. 2. There appears to have been a load of gravelly-stonesbrpought in, and distributed beside the creek, including at the mouth of the South drain. 3. The branches and twigs that were partially blocking the South drain last time (2/3/11) have been cleared away. 4. The EC reading is high. 5 The site was relatively clear of rubbish this time 6. Water flow moderate and permanent
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au