Waterwatch Data Portal
ME_YDI800 Diamond Creek @ Edendale Environment Centre footbridge
16 May 2011
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800 |
Date and Time | Monday 16th May 2011 13:00pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.04 | 7 | 280 | 8.4 | 0 | 16.6 | 11.9 | 150 |
Weather | overcast |
---|---|
Last rainfall | During the last week 43 |
Flow estimate | Rapid |
Water Appearance | Muddy,Foamy/frothy |
Stream depth | 1m - 2m |
Stream width | >5m |
Hazards | |
Litter/Pollutants | bottles,cans,packets,plastic,polystyrene,other |
Other rubbish: 4 balls, 1 cup, 3 pieces of poly foam, 1 chair, 1 shopping trolley and orange mesh. What stands out: all the rubbish. The rocks have stabilised the banks close to the bridge, but there is severe erosion upstream, on the Edendale side. Up rooted trees still in the creek. A creek side Acacia close to the bridge is close to dead. Action contacted the local Council about the trolley and orange mesh.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au