Waterwatch Data Portal
ME_YPL698 small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough
20 December 2011
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | small drain, flowing from GPAC construction site into Plenty River, close to footbridge, Greensborough ME_YPL698 |
Date and Time | Tuesday 20th December 2011 10:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.01 | 10 | 530 | 7.8 | 0.2 | 21.6 | 19.7 | 40 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | Slow |
Water Appearance | Muddy |
Stream depth | 0 - 50cm |
Stream width | 0.4 |
Hazards | |
Litter/Pollutants |
Flow in drain decreased, flow in river increased.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au