Site visit details

Overview

Catchment Yarra River
Site Kalparrin Lake, east end of the lake (sample point 2) near the stormwater entry point, close to Plenty River, Greensborough ME_YPL681
Date and Time Thursday 16th September 2010 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.1 6 600 7.6 0.05 12.1 13.6 20
Weather
Last rainfall During the last 24 hours
Flow estimate Slow
Water Appearance Milky,Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants bottles,plastic
water has a brown tinge what stands out about the site today? grass clippings in water- freshly mowed

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au