Site visit details

Overview

Catchment Yarra River
Site Karingal Creek, crn Susan and Brougham St, Eltham ME_YDI847
Date and Time Wednesday 22nd June 2011 11:50am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.04 9 580 7.7 0.1 13.8 12.2 35
Weather overcast
Last rainfall During the last 24 hours 6.4
Flow estimate Rapid
Water Appearance Muddy,Oily
Stream depth 0.25
Stream width 4
Hazards
Litter/Pollutants packets,plastic
Tree branch across the waterway. Filtered samples before performing the Ammonium and Phosphate tests. I did the Phosphate twice (just to make sure)

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au