Waterwatch Data Portal
Site visit details
Overview
Catchment | |
---|---|
Site | King River, Wilson Rd Bridge NE_KIN065 |
Date and Time | Thursday 18th August 2011 14:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 57.9 | 59 | 8 | 15 | 24 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
The river was flooded at the time and there had been a lot of heavy rainfall. We did not conduct the reactive phosphate test.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au