Waterwatch Data Portal
GB_CRE007 Creightons Creek between Ramages and Baronga Creeks
15 January 2012
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek between Ramages and Baronga Creeks GB_CRE007 |
Date and Time | Sunday 15th January 2012 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 140 | 6.8 | 10 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall:~ 20mm in both late Dec and Jan prior to 15th. Ec about same as Dec at all sites except JIM -+540. Turbidity also ~ same as Dec, CRE015 and JIM010 sig lower
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au