Waterwatch Data Portal
ME_EWA300 Warringine Creek downstream of Frankston-Flinders/Watts Rd
27 October 2010
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Warringine Creek downstream of Frankston-Flinders/Watts Rd ME_EWA300 |
Date and Time | Wednesday 27th October 2010 10:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 2000 | 7.2 | 0.1 | 20.4 | 13.4 | 40 |
Weather | overcast |
---|---|
Last rainfall | During the last week |
Flow estimate | Slow |
Water Appearance | Other: discoloured |
Stream depth | 0 - 50cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Green algae in first pipe/aqueduct Creek 9m across but only 1m flowing, 8m blocked, both sides arches blocked and middle arch blocked across two thirds of distance. Persons conducting tests: Adrienne Meyer, Trevor Meyer
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au