Site visit details

Overview

Catchment Bunyip River
Site Warringine Creek downstream of Frankston-Flinders/Watts Rd ME_EWA300
Date and Time Monday 27th December 2010 14:35pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1900 7 0.1 18.3 15.2 10
Weather cloudy
Last rainfall During the last week
Flow estimate Slow
Water Appearance Other: discolored
Stream depth 0 - 50cm
Stream width >5m
Hazards
Litter/Pollutants plastic
Persons conducting tests: Adrienne Meyer, Trevor Meyer A lot of green algae in first pipe/aqueduct. A lot of blackberry making access to the creek area difficult. Creek 9m across but only 1 m flowing, 8m blocked, both sides arches blocked and middle archh blocked across 2/3rds of the distance.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au