Waterwatch Data Portal
ME_EWA300 Warringine Creek downstream of Frankston-Flinders/Watts Rd
20 November 2010
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Warringine Creek downstream of Frankston-Flinders/Watts Rd ME_EWA300 |
Date and Time | Saturday 20th November 2010 13:15pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 1500 | 7.1 | 0.1 | 25.4 | 15.3 | 15 |
Weather | sunny |
---|---|
Last rainfall | During the last week |
Flow estimate | Slow |
Water Appearance | Other: discoloured |
Stream depth | 0 - 50cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Green algae in first pipe/aqueduct. A lot of blackberry making access to the creek area difficult. Biting midgies Creek 9m across but only 1m flowing, 8m blocked, both sides arches blocked and middle arch blocked across two thirds of distance. Less litter around grassed area of site. Persons conducting tests: Adrienne Meyer, Trevor Meyer
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au