Site visit details

Overview

Catchment Bunyip River
Site Warringine Creek downstream of Henderson/Boes Rd bridge ME_EWA080
Date and Time Friday 27th May 2011 11:20am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1500 7 0.1 16 12.1 30
Weather overcast
Last rainfall During the last 24 hours
Flow estimate Rapid
Water Appearance Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants bottles,cans,paper,plastic
 Flowing in 4 out of the 5 pipes, very little white frothy scum 10cm x 15cm, pipe completely under water and can’t be seen. Slightly Milky brown water at sides each end. Persons conducting tests: Adrienne Meyer, Trevor Meyer

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au