Site visit details

Overview

Catchment Bunyip River
Site Balcombe Creek at Augusta St Bridge, Mt Martha ME_EBA900
Date and Time Sunday 10th July 2011 09:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 8 1710 6.8 0.05 13 10 10
Weather overcast
Last rainfall During the last 24 hours
Flow estimate Slow
Water Appearance Stained brown
Stream depth 1m - 2m
Stream width >5m
Hazards
Litter/Pollutants
changed since last time: water level higher, pH decreased Estuary entrance closed, waves washing over bar with high winds. rainfall since last reading: 44.2 mm people conducting tests: Chris Spencer, John Inchley

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au