Waterwatch Data Portal
ME_ESU450 Sunshine Creek at outfall to Port Phillip Bay, Mt Martha
4 July 2011
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sunshine Creek at outfall to Port Phillip Bay, Mt Martha ME_ESU450 |
Date and Time | Monday 4th July 2011 13:00pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 8 | 2500 | 8.1 | 0.03 | 14 | 10 | 15 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | Moderate |
Water Appearance | Stained brown |
Stream depth | 0 - 50cm |
Stream width | 0.6 |
Hazards | |
Litter/Pollutants | bottles,plastic,polystyrene |
Last rain 2.0 mm yesterday A little foaming ; water looking reasonably clear. Foam blwoing in off the bay. Rainfall: Last Week 0.2mm; June 69.4mm: 2011 to date 548mm. (Devil Reservoir figures from Melb Water website). Large polystyrene sheet washed up into bushes above high tide mark
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au