Site visit details

Overview

Catchment Bunyip River
Site Warringine Creek downstream of Frankston-Flinders/Watts Rd ME_EWA300
Date and Time Saturday 3rd December 2011 11:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 1600 7.1 0.1 21 15 15
Weather overcast
Last rainfall During the last week
Flow estimate Moderate
Water Appearance Other: discoloured
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants bottles,cans,packets,paper,polystyrene,other
persons conducting tests: Adrienne Meyer, Trevor Meyer Litter: all rubbish around banks and roadway not in water.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au