Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, upstream Murray Road/Southern Road bridge, Preston/Heidelberg Heights. ME_YDA435
Date and Time Sunday 18th September 2016 10:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 10 670 8 0.8 13.4 13.3 31
Weather cloudy
Last rainfall During the last 24 hours 0.40
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance
Stream depth Other:
Stream width Other:
Hazards
Litter/Pollutants

- Water moving at higher speed than previous testing - surrounding grass recently mowed

-Bubbles (white foam) in the water

- Higher water level

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au