Site visit details

Overview

Catchment Goulburn River
Site Creightons Creek d/s of Threlful Creek GB_CRE003
Date and Time Sunday 18th September 2016 12:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 100 6.3 10.5 0.03 32
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Rainfall: 32mm in August, 77 mm in September

EC: lower at all sites

Turbidity: same as August at  4 sites, slight increase at other sites

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au