Waterwatch Data Portal
GB_CRE003 Creightons Creek d/s of Threlful Creek
16 October 2016
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek d/s of Threlful Creek GB_CRE003 |
Date and Time | Sunday 16th October 2016 12:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 110 | 12 | 20 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: 145 mm between 18th Sept and 16th Oct 2016
EC: mostly higher than September, lower at CRE013 and CRE014
Turbidity: lower at all Creightons Ck sites, higher at RAM005 and BAR010
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au