Waterwatch Data Portal
GB_TRE010 Threlful Creek at Creightons Creek
20 November 2016
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Threlful Creek at Creightons Creek GB_TRE010 |
Date and Time | Sunday 20th November 2016 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 130 | 6.1 | 15 | 0.08 | 21 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: since 16-10-16 had 19 mm, ~30 mm to 13-11-16.
EC: ~ upstream same as last month.Downstream of CRE011 is significantly higher
Turbidity: ~ same at all sites except CRE013 (7 to 20).
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au