Site visit details

Overview

Catchment Maribyrnong River
Site Riddells Creek at the old swimming hole ME_MRD600
Date and Time Saturday 1st October 2016 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N Nitrate mg/L pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 96.061 10 310 7.4 0.02 14 13.5 10
Weather overcast
Last rainfall During the last 24 hours 125.00
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Foamy/frothy
Stream depth Other:5200mm measured at the official gauge located at the flow meter testing site.
Stream width > 5m
Hazards
Litter/Pollutants plastic,other: 5L Oil Container (closed)

Fast, minor flood flows continuously from September. Noticeable elevated turbidity levels however not measureable on Turbidity Tube. Blobs of foam as a result of flooding. Some tree guards & stakes washed downstream. No obvious damage to Creek banks, bank vegetation is holding up well to the flows.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au