Site visit details

Overview

Catchment Goulburn River
Site Cussen Park Site 3 - Weir Wall, downstream GB_WCP003
Date and Time Wednesday 31st August 2016 13:25pm
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L E coli orgs/100mL EC µS/cm Nitrate-Nit mg/L N pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 62 6 109 6.2 0 15.5 41
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Water temperature at footbridge is quite high and Dissolved Oxygen level is low. These parameters will be closely monitored over the warmer months.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au