Site visit details

Overview

Catchment Goulburn River
Site Outlet pit of bioremediation basin - Wetland at Gemmills Swamp GB_WGS003
Date and Time Wednesday 28th September 2016 13:40pm
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 12 28 2.8 96 107 5.9 6 15.1 0.32 6
Weather
Last rainfall
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Significant levels of E coli occur at WGS001 but reduces as water reaches Gemmill Swamp outlet WGS004.

Total phosphorus remains high through the retention basin this sampling.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au