Waterwatch Data Portal
ME_YYD808 Chelsworth Input (stormwater capture draining to Reedy Billabong)
16 March 2017
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Chelsworth Input (stormwater capture draining to Reedy Billabong) ME_YYD808 |
Date and Time | Thursday 16th March 2017 09:35am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 2.37 | 65.11 | 5.8 | 250 | 7 | 0.34 | 21 | 21 | 30 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 4.00 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Stained brown |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
There had been a heavy downpour of rain in the north-east suburbs. This site is the meeting point of two storm-water drains.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au