Site visit details

Overview

Catchment Yarra River
Site Karingal Creek, crn Susan and Brougham St, Eltham ME_YDI847
Date and Time Wednesday 19th April 2017 14:30pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.07 6 590 7.1 0.15 25.8 18.7 50
Weather cloudy
Last rainfall During the last week 0.20
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Muddy
Stream depth Other:15cm
Stream width Other:4 metres
Hazards
Litter/Pollutants paper,plastic,clothing,other: rusted steel strips

Normally if turbidity was over 40 I would filter the sample pre- testing for Ammonium and Phosphate, but as it now seems it’s inadvisable to filter (unless it’s done all the time) I didn’t. Consequently, I did find estimating those results using the colour wheel a bit more difficult.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au