Waterwatch Data Portal
CO_SWA110 Lake Victoria outlet @ Bellarine Hwy
31 October 2016
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Lake Victoria outlet @ Bellarine Hwy CO_SWA110 |
Date and Time | Monday 31st October 2016 11:45am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 68.96 | 5.4 | 61000 | 9.1 | 0.03 | 15 | 15 | 12 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Clear |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
Auto Dissolves O2 is 68.96%, old method via chart is 55% ???
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au