Waterwatch Data Portal
EG_NRB091 Nicholson River Backwater - 500m upstream @ bottom (at fence)
6 May 2017
Site visit details
Overview
Catchment | Nicholson River |
---|---|
Site | Nicholson River Backwater - 500m upstream @ bottom (at fence) EG_NRB091 |
Date and Time | Saturday 6th May 2017 10:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Secchi m | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 48.9 | 37180 | 5.9 | 0 | 12.7 | 18.3 | 0 |
Weather | overcast |
---|---|
Last rainfall | More than a week ago 75.00 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | Other:1.7 |
Stream width | |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au