Site visit details

Overview

Catchment Goulburn River
Site Baronga Creek at Creightons Creek GB_BAR010
Date and Time Sunday 21st May 2017 12:00pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb FTU Turb NTU
Sample 130 6.4 8 9
Weather sunny
Last rainfall During the last week 8.00
Flow estimate
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants

Ec lower than April

Turbidity same as April

pH  .1 higher than March

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au