Site visit details

Overview

Catchment Otway Coast
Site Barham R East branch at reveg site on Barham Valley Rd CO_BHR066
Date and Time Monday 23rd May 2016 11:15am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 87.08 9.4 200 7.8 0.12 13 11.9 10
Weather cloudy
Last rainfall During the last 24 hours 12.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au