Waterwatch Data Portal
CO_PAK001 Wetland at end of Pakington st, Newtown
10 October 2015
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Wetland at end of Pakington st, Newtown CO_PAK001 |
Date and Time | Saturday 10th October 2015 16:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 94.9 | 8.8 | 130 | 7.5 | 0.75 | 24 | 19 | 170 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | Stained brown |
Stream depth | 0 - 50cm |
Stream width | |
Hazards | |
Litter/Pollutants | plastic |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au