Waterwatch Data Portal
GB_SUG020 Sugarloaf Creek at ford in Ashes Bridge Road
24 April 2017
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Sugarloaf Creek at ford in Ashes Bridge Road GB_SUG020 |
Date and Time | Monday 24th April 2017 09:10am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 104 | 1290 | 7.3 | 0.2 | 16.1 | 1011 | 14.28 |
Weather | |
---|---|
Last rainfall | During the last week 32.80 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Flowing again. Had a lot of rain Friday - 17.2 mm to 9am, then 15.6 mm to 9am Saturday.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au