Site visit details

Overview

Catchment Goulburn River
Site Sugarloaf Creek at ford in Ashes Bridge Road GB_SUG020
Date and Time Monday 16th May 2016 09:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 866 600 6 0 9.5 12.1 2420 397
Weather
Last rainfall
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Muddy
Stream depth
Stream width
Hazards
Litter/Pollutants

Photo us ds and across.  pH done with strips as meter wont calibrate.  Flowing. Very turbid - like dirty clay dam water.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au