Site visit details

Overview

Catchment Goulburn River
Site Sugarloaf Creek at Pyalong-Tallarook Rd GB_SUG018
Date and Time Monday 19th September 2016 10:00am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 94.1 10.27 330 7.6 10.6 11.5 36.1
Weather
Last rainfall
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

No E.coli as not able to be tested this month.  No pH as meter broken.  Fast high flow, Fences down, sand shifted. Has been up to 2 metres deeper over last week by look of vegetation surrounding the site. Photos taken.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au