Waterwatch Data Portal
ME_ETN900 Tanti Creek upstream of Estuary (land side of Esplanade)
13 July 2017
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900 |
Date and Time | Thursday 13th July 2017 10:20am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FAU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 8.9 | 5590 | 7.7 | 10.8 | 10 | 3.76 |
Weather | overcast |
---|---|
Last rainfall | During the last week 0.00 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | < 2m |
Hazards | |
Litter/Pollutants | packets |
Ran out of phosphate acid reagent so no phosphate analysis completed.
SE Water are currently doing real-time water quality analysis adjacent to this site. Doing in conjunction with Monash University. Called the Beach Guard project.