Waterwatch Data Portal
NC_CMB150 Campbells Creek, Crossing Princess Road
24 July 2017
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Campbells Creek, Crossing Princess Road NC_CMB150 |
Date and Time | Monday 24th July 2017 10:15am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 1155 | 7.1 | 0.05 | 8 | 9.3 | 30 |
Weather | overcast |
---|---|
Last rainfall | During the last week 15.00 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Stained brown |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
Highest turbidity experienced so far. Turbid flow evident upstream of WWTP. New pH & EC meters used for first time, both reading lower than old meters ie pH 7.5, EC 1300.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au