Site visit details

Overview

Catchment Lake Victoria
Site Forge Creek, corner bend - Site 2 EG_FOR040
Date and Time Monday 24th July 2017 14:02pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 218 7.19 0.05 16.9 10.6 90
Weather sunny
Last rainfall During the last week 2.60
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Stained brown,Muddy
Stream depth 0 - 50cm
Stream width < 2m
Hazards
Litter/Pollutants

In the earlier full data report for Site #2 on 24 July 2017, the phosphate reading was incorrectly entered as 0.16 mg/l P. The correct entry is given above as 0.05 mg/l P.
Apologies for this error.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au