Waterwatch Data Portal
ME_EBI200 Bittern catch drain, 20m above Devilbend Creek
20 September 2017
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Bittern catch drain, 20m above Devilbend Creek ME_EBI200 |
Date and Time | Wednesday 20th September 2017 11:12am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 8 | 871 | 6.1 | 0.01 | 18 | 14 | 33 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours 2.00 |
Flow estimate | BANKFULL: High flow within channel capacity and in-stream habitats connected |
Water Appearance | Stained brown,Muddy |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
second test at this site after diversion bank and pipe installed, turbidity very high due to recent works and water now dammed up and flowing through pipe into reservoir. very soft under foot . birds and sea eagle in the area.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au