Site visit details

Overview

Catchment Yarra River
Site Mullum Mullum Creek at Tandarook Crescent, Donvale ME_YML047
Date and Time Wednesday 22nd November 2017 15:00pm
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate mg/L pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.02 113.47 9.2 240 1.02 7.2 0.042 33 26 10
Weather sunny
Last rainfall During the last week 0.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants bottles,paper,plastic,cans

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au