Site visit details

Overview

Catchment Bunyip River
Site Bittern Dam, near dam wall and catch drain ME_EBI100
Date and Time Monday 23rd October 2017 23:34pm
Approved Approved

Notes

Physical Chemical Tests

N mg/L NH4+ D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 9 1493 0 8.5 0 17 18.3 0
Weather overcast
Last rainfall During the last 24 hours 2.00
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width > 5m
Hazards
Litter/Pollutants

no rubbish. a lot of bird life

Diary photos

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au