Waterwatch Data Portal
GB_SUG020 Sugarloaf Creek at ford in Ashes Bridge Road
25 September 2017
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Sugarloaf Creek at ford in Ashes Bridge Road GB_SUG020 |
Date and Time | Monday 25th September 2017 09:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 78.3 | 8.07 | 670 | 7.2 | 0 | 14.1 | 11.55 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
TP taken. No photos.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au