Site visit details

Overview

Catchment Goulburn River
Site Sunday Creek on Spur at Clonbinane GB_SUN005
Date and Time Sunday 19th November 2017 11:45am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm Nitrate-Nit mg/L N pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 1150 35 18.1 19
Weather sunny
Last rainfall During the last week 35.00
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Muddy
Stream depth 0 - 50cm
Stream width < 2m
Hazards
Litter/Pollutants bottles,cans

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au