Waterwatch Data Portal
GB_WGS003 Outlet pit of bioremediation basin - Wetland at Gemmills Swamp
30 November 2017
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Outlet pit of bioremediation basin - Wetland at Gemmills Swamp GB_WGS003 |
Date and Time | Thursday 30th November 2017 11:15am |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 50 | 16.64 | 1.4 | 65 | 114 | 6.25 | 0 | 24 | 2420 | 0.45 | 21.9 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au