Waterwatch Data Portal
ME_YGC100 Grace Burn at the Wallace Parade bridge, Healesville
9 February 2018
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Grace Burn at the Wallace Parade bridge, Healesville ME_YGC100 |
Date and Time | Friday 9th February 2018 09:15am |
Approved | Approved |
Physical Chemical Tests
N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | Nitrate mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 89.48 | 8.2 | 50 | 0.23 | 6.6 | 0 | 20.5 | 19.6 | 16.61 |
Weather | cloudy |
---|---|
Last rainfall | More than a week ago |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au