Waterwatch Data Portal
CO_SWA140 Lake Victoria @ Hollywood Estate, (Emily St wetlands)
15 March 2018
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Lake Victoria @ Hollywood Estate, (Emily St wetlands) CO_SWA140 |
Date and Time | Thursday 15th March 2018 14:35pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | Nitr mg/L | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 95.95 | 8.3 | 14550 | 8.5 | 0.015 | 22 | 20 | 7 |
Weather | overcast |
---|---|
Last rainfall | During the last week 1.00 |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | Stained brown |
Stream depth | 0 - 50cm |
Stream width | > 5m |
Hazards | |
Litter/Pollutants | plastic,polystyrene |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au